Macro & Mini-Macro ROW Solutions

Full macro capacity where traditional tower sites aren't available. Custom-engineered ROW infrastructure for mid-cells, mini-macros, and full macros in the markets that have blocked you.

Beyond Small Cell Capacity

When you need more than small cell capacity but can't secure traditional tower sites, ROW macro infrastructure fills the gap. Our bespoke designs support full macro loads—mid-cells, mini-macros, and full macro configurations—in jurisdictions that would never approve a traditional tower.

We engineer from the ground up for your actual equipment—antenna arrays, radio units, power requirements—designing poles that handle macro loads while meeting the aesthetic demands of difficult jurisdictions.

The result: macro capacity in markets your competitors can't crack, deployed in weeks instead of the years traditional approaches would require.

Custom Design Capabilities

Every pole engineered for its specific deployment

Equipment-Specific Design

Poles engineered around your actual radio units, power requirements, and antenna configurations—not generic specs.

RF Performance Optimization

Antenna mounting positions and orientations optimized for your coverage objectives and interference mitigation.

Aesthetic Integration

Custom concealment and finishing to meet municipal requirements while maintaining full equipment functionality.

Site-Specific Engineering

Structural and foundation designs tailored to specific site conditions, utilities, and right-of-way constraints.

Future Expansion Capacity

Built-in capacity for equipment upgrades, technology evolution, and potential multi-tenant conversion.

Rapid Manufacturing

USA-based production with typical lead times of 3-4 weeks from final design approval.

From Design to Deployment

Our design process begins with detailed site assessments and equipment specifications. We then develop preliminary designs for RF and aesthetic review before finalizing engineering drawings.

Once approved, USA manufacturing typically delivers finished poles in 3-4 weeks. Our team can coordinate with installation contractors to ensure proper deployment.

This integrated approach minimizes the back-and-forth that delays projects with off-the-shelf solutions.

Design Your Macro ROW Solution

Let's discuss how custom macro and mini-macro infrastructure can unlock capacity in your most difficult markets.

START THE CONVERSATION